Lead Times by Brand

These are factory production lead times. We do not account for the shop drawing approval process, and shipping times from the factory to the jobsite. We highly encourage you to review your project early as price increases are erratic and no longer on an annual cycle.

Last Updated: October 25th, 2024.

Andersen

  • E-Series: 5-9 weeks
  • A-Series: 5-6 weeks (Traditional/Contemporary Windows), 4-9 weeks (Doors)
  • 100 Series: 2-4 weeks
  • 200 Series: 2-3 weeks (Windows), 2-4 weeks (Doors)
  • 400 Series: 3-6 weeks (Windows), 3-5 weeks (Doors)

Milgard

  • Trinsic: 2-3 weeks
  • Tuscany: 2-3 weeks
  • Style Line: 2-3 weeks
  • Ultra: 3-5 weeks

Jeld-Wen

  • Siteline: 6-10 weeks (Windows), 16 weeks (Swing Doors)
  • Custom: 6-7 weeks
  • Vinyl: 3 weeks

Marvin

  • Ultimate: 7-9 weeks 
  • Modern: 9-10 weeks
  • Elevate: 5-6 weeks
  • Essential: 9-10 weeks

LaCantina Doors

  • Bifolds: 3-4 weeks, 8 weeks (Custom), 7-10 weeks (V2 Alum Int), 12 weeks (V2 Alum Int, Custom), 14 weeks (V2 Wood Int and V2 Alum Int w/ LCD White, LCD Bronze Anodized, and LCD Shadow Black finishes)
  • Swing Doors: 4 weeks, 8 weeks (Custom)
  • Sliding Doors: 4 weeks, 8 weeks (Custom)

Win-Dor

  • Windows: 4-6 weeks
  • Doors: 4-6 weeks

TruStile

  • MDF: 3-8 weeks*
  • Custom Wood: 10-13 weeks*

*Lead times can vary based on door type, consult your sales rep for the most accurate lead times for your project

Euroline

  • CAD Drawing: 3-6 weeks
  • Production: 18-26 weeks after CADs Approval
  • Drafting Revisions: 4-6 weeks

Fleetwood

  • Any Series Standard Finish: 6-8 weeks
  • Any Series Custom Finish: 15-20 weeks

Alpen

  • Zenith: 5-6 weeks
  • Tyrol: 3-4 weeks